Answer:
You will need to
contact the
engineering
department by phone
or email
engineering@shelbyelectric.coop
to
set up an
appointment with a
field engineer to
come and look over
the site. Further
actions are
dependent upon the
site assessment.
The same is true if
you want a line
moved for some
reason or
underground
installed from
overhead.
As with the site
assessment, an
invoice will be
billed to the new
member covering the
new site costs and
must be paid to
Shelby Electric
Cooperative before
site construction
begins. Some
invoices require
deposits, some
require a 10%
contract to be
signed and paid in
full. |